The single buyer: how Nepal buys and sells its electricity

|

Title card: The single buyer: how Nepal buys and sells its electricity, from the Nepal's Energy Future series

Almost every unit of electricity made in Nepal passes through one buyer before it reaches a home, a factory or an Indian exchange. Here is how that works.

Each day, in a control room in Kathmandu, engineers at the Nepal Electricity Authority’s Load Dispatch Centre do two things at once. They balance the national grid minute by minute, watching voltage, frequency and the flow across the border. And they forecast how much power Nepal will have spare, or short, tomorrow, so that the utility can bid into India’s day-ahead and real-time electricity markets.1 A backup centre in Hetauda mirrors the whole operation in case Kathmandu goes dark.1

It is unglamorous work, and it sits at the centre of the most important change in Nepal’s economy this decade. In fiscal year 2082/83 (2025/26), Nepal sold 3,965 gigawatt-hours of electricity across the border, two-thirds more than the year before, and bought 1,171 gigawatt-hours back. Export revenue reached NPR 29.3 billion.2 For a country that spent most of the last decade importing power every winter, that is a reversal.

To understand what comes next, from the 10,000-megawatt promise to India to the arguments over power purchase agreements and free power, it helps to see the machine first. Nepal’s electricity system has many generators, several export routes and one buyer standing between them. This is the first post in a series on Nepal’s energy future, and it starts with that buyer.

One buyer, many sellers

The Nepal Electricity Authority, set up under an Act of 2041 (1984), generates power, runs the transmission grid, distributes electricity to most consumers and buys almost everything it does not make itself.2 Of the 18,624 gigawatt-hours available in Nepal last fiscal year, NEA and its subsidiary companies produced 36 per cent, independent power producers supplied 58 per cent, and imports from India made up the remaining 6 per cent.2 Installed capacity reached 4,120 megawatts, with 529 megawatts added during the year.2

The independent producers are the part most people never see. They are private companies that build hydropower plants and sell the output to NEA under long-term power purchase agreements. The agreement sets the price, the seasons and what happens when the grid cannot take the power. For the developer, it is the document a bank reads before it lends. For NEA, it is a promise to pay that runs for decades. Those agreements deserve a post of their own, and will get one in this series.

What matters here is the shape of the system. A private plant in the hills does not sell to a factory in Biratnagar or a buyer in Bihar. It sells to NEA. NEA then sells to Nepali consumers at regulated tariffs, and sells whatever is left across the border.

Nepal does not yet have an electricity market. It has one buyer at home, and a neighbour’s market next door.

Ashish Bhandari

Four ways across the border

Bar chart of NEA electricity imports and exports, GWh, fiscal years 2073/74 to 2082/83: imports between about 1,200 and 2,800 GWh a year; exports rising from almost nothing to 3,965 GWh in 2082/83, when imports fell to 1,171 GWh
Chart: Ashish Bhandari, from Nepal Electricity Authority, A Year in Review FY 2025/26, appendix (2082/83 figures provisional). Free to share with credit.

NEA’s own annual report lists the routes. Power crosses the border under government-to-government arrangements, through bilateral arrangements such as supplies to Haryana and Bangladesh, through what NEA calls the Power Exchange Corporation mechanism, and as free power allocations such as Tanakpur. On top of these, NEA bids directly into India’s day-ahead and real-time markets.1

None of this happens without Indian permission. India’s Central Electricity Authority approves the quantities Nepal may trade on its exchanges, project by project and season by season. On 17 November it approved NEA to import up to 350 megawatts from India between 17 November 2026 and 31 July 2027, for up to 17 hours a day, at market prices, and to sell 56 megawatts from three Nepali projects on the Indian Energy Exchange.3 The bigger framework sits above that: in January 2024 the two governments agreed that Nepal would export 10,000 megawatts to India over ten years.4

The arrangement works, and the export numbers prove it. It also means that the most valuable thing Nepal sells is priced in another country’s market and moves on another country’s permission. A developer pricing a new plant, or a bank lending to one, has to take a view on both.

A year of two halves

Monthly bar chart for fiscal year 2082/83: exports of 538 to 712 GWh a month from Shrawan to Kartik, falling to near zero from Poush to Chaitra while imports rise to 254 to 272 GWh a month, then exports recover to 582 GWh in Ashadh
Chart: Ashish Bhandari, from Nepal Electricity Authority, A Year in Review FY 2025/26, appendix. Free to share with credit.

The annual totals hide a sharp seasonal swing. Most of Nepal’s plants run on the flow of rivers, and rivers follow the monsoon. In Ashwin (mid-September to mid-October 2025), Nepal exported 712 gigawatt-hours in a single month. By Magh (mid-January to mid-February 2026), exports had fallen to almost nothing and imports had climbed to 254 gigawatt-hours; they peaked at 272 gigawatt-hours in Falgun.5

Demand is moving the other way. The system peak, including exports, reached 3,226 megawatts on 6 July 2026; peak demand inside Nepal reached 2,479 megawatts on 28 June.5 Summer peaks are easy to meet when the rivers are full. Winter evenings, when rivers are low and households turn on heaters and lights, are where the system is tight, and where imports fill the gap.

That pattern explains a great deal of Nepal’s energy debate. It is why storage and reservoir projects keep coming up, why the timing of a power purchase agreement’s “dry season” matters so much, and why a net exporter over the year can still be an importer in January.

What the headline numbers leave out

NPR 29.3 billion of export revenue is a real achievement. Set it against the rest of NEA’s accounts and the picture is more complicated. The authority spent NPR 96.1 billion buying power in 2082/83, up nearly 24 per cent, as more private plants came online. Its pre-tax profit fell to NPR 5.04 billion, which it attributes mainly to foreign-exchange losses on loans, higher depreciation and interest, and provisions against receivables it does not expect to collect.6

There is a fair argument that this is exactly how a growing system should look: buy more from private producers, sell the surplus abroad, and accept thinner margins while the grid expands. The counter-argument is about risk concentration. A single buyer carries every long-term purchase commitment, every currency exposure on foreign loans, and every unsold megawatt when the border or the grid cannot take it. When that buyer’s profit narrows, the whole chain, from developers waiting for payment to lenders pricing new projects, feels it.

In the project work I have done, the single-buyer model has one undeniable strength: it is simple to contract with. One counterparty, one standard agreement, one grid operator. Its weakness is the same. When that counterparty is slow to sign, slow to pay or short of transmission capacity, there is no one else to sell to.

What to watch this winter

The 350-megawatt import approval will be tested over the coming months, when Nepal’s own output is at its lowest and evening demand at its highest. Watch how much NEA actually imports and at what price, and whether exports resume as early as the spring. Watch, too, for any change to the annual approvals that govern trade, which developers and lenders would like to see replaced by longer commitments.

The bigger question is whether the single buyer stays the single seller. In the same week as the import approval, India’s Central Electricity Authority cleared NEA to sell a further 594 megawatts on the Indian Energy Exchange until mid-June 2027, taking Nepal’s authorised exports to 1,198 megawatts.7 Every one of those megawatts is NEA’s to sell. That may start to change. On 16 October Nepal’s energy minister decided to issue letters of intent to private companies that want to trade electricity across the border, and about a dozen have applied.8 The letters let a company study markets, find partners and prepare agreements. They do not let it sign a power purchase agreement, book transmission capacity or sell. That needs an amended Electricity Act, which the energy ministry has sent to the law ministry, and approval under India’s cross-border trade guidelines, which so far recognise only NEA as the trader from Nepal.8

Tonight, as on every night this winter, the engineers in that Kathmandu control room will forecast tomorrow’s shortfall and place their bids. Whether Nepal can one day sell in January as well as in July depends on decisions about storage, contracts and institutions that the rest of this series will follow, starting with who runs the power sector and who answers for it.

For the contract problems behind some of the largest export projects, read the dams that wait. If you’d like to discuss this article, get in touch.

Notes

  1. Nepal Electricity Authority, A Year in Review: Fiscal Year 2025/2026 (Kathmandu: NEA, August 2026), 43-44, https://nea.org.np/uploads/shares/td_tender/A%20Year%20In%20Review%20Annual%20Report%202025_2026_compressed.pdf; “NEA to export 56 MW and import 350 MW of electricity from India,” The Annapurna Express, 17 November 2026, https://theannapurnaexpress.com/story/68823/. ↩
  2. Nepal Electricity Authority, A Year in Review: Fiscal Year 2025/2026, 1-3, https://nea.org.np/uploads/shares/td_tender/A%20Year%20In%20Review%20Annual%20Report%202025_2026_compressed.pdf; “Nepal Electricity Authority profit decreases in FY 2082/83,” Ratopati, August 2026, https://english.ratopati.com/story/75128/electricity-authority-historic-leap-in-income-and-exports-but-decline-in-net-profit. Figures for 2082/83 are provisional, subject to audit. ↩
  3. “NEA gets approval to import 350 MW of electricity from India this winter,” Onlinekhabar, 17 November 2026, https://english.onlinekhabar.com/nea-approval-import-electricity-india.html; “NEA to export 56 MW and import 350 MW of electricity from India,” The Annapurna Express, 17 November 2026, https://theannapurnaexpress.com/story/68823/. ↩
  4. “Nepal, India ink 10-year, 10,000MW power trade,” The Kathmandu Post, 4 January 2024, https://kathmandupost.com/national/2024/01/04/nepal-india-ink-10-year-10-000mw-power-trade; “Nepal, India sign long-term agreement on electricity export,” The Himalayan Times, 4 January 2024, https://thehimalayantimes.com/business/nepal-india-sign-long-term-agreement-on-electricity-export. ↩
  5. Nepal Electricity Authority, A Year in Review: Fiscal Year 2025/2026, 3, 44 and appendix 167-168, https://nea.org.np/uploads/shares/td_tender/A%20Year%20In%20Review%20Annual%20Report%202025_2026_compressed.pdf. Official data from one source; monthly figures are NEA’s own records. ↩
  6. Nepal Electricity Authority, A Year in Review: Fiscal Year 2025/2026, 3, https://nea.org.np/uploads/shares/td_tender/A%20Year%20In%20Review%20Annual%20Report%202025_2026_compressed.pdf; “Nepal Electricity Authority profit decreases in FY 2082/83,” Ratopati, August 2026, https://english.ratopati.com/story/75128/electricity-authority-historic-leap-in-income-and-exports-but-decline-in-net-profit. ↩
  7. “NEA Secures Approval From India to Sell 594 MW of Electricity from Projects,” New Spotlight, 19 November 2026, https://www.spotlightnepal.com/2026/11/19/nea-secures-approval-india-sell-594-mw-electricity-projects/; “Nepal Authority Gets Permission to Sell 594 MW Electricity to Indian Energy Exchange,” Ratopati, 19 November 2026, https://english.ratopati.com/story/87299/permission-granted-for-export-of-a-total-of-1198-mw-of-electricity-from-nepal-to-india. ↩
  8. “Govt opens door for private sector to prepare for cross-border electricity trade,” Onlinekhabar, 16 October 2026, https://english.onlinekhabar.com/private-sector-cross-border-electricity-trade.html; “Nepal opens door to private power traders, but legal hurdles remain,” The Kathmandu Post, 24 October 2026, https://kathmandupost.com/money/2026/10/24/legal-ground-needed-after-nepal-opens-letters-of-intent-for-private-sector-in-cross-border-power-trade; “India’s regulatory barriers stymie Nepal’s private sector power export ambitions,” Clickmandu, 7 October 2026, https://english.clickmandu.com/2026/10/11952/. ↩

This is general commentary, not legal advice. Readers should seek independent advice on their own circumstances.

Ashish Bhandari

Ashish Bhandari

Ashish writes about contracts, procurement, project delivery and law in Nepal, drawing on 18 years of work on projects and contracts.